ISRO’s SCL Mohali: India’s Semiconductor Chip Journey
Explore SCL Mohali's journey from its 1976 founding and 1989 fire to ISRO's indigenous processors and India's ₹4,500 crore chip modernisation plan.
Latest Story
SCL Mohali, the Semi-Conductor Laboratory, was making chips before most of today’s chip race began. Founded in 1976, it was exporting three-micron chips by 1986, then lost its device fab to a fire on 7 February 1989. It rebuilt, moved under the Department of Space, and now makes 180 nm processors for ISRO launch vehicles. This page traces the full record, says which dates come from officials and which from a newspaper account, and separates the announced ₹4,500 crore upgrade from the one finished so far.
SCL is not an ISRO unit, the fire was not proven sabotage, and ₹4,500 crore is a plan. SCL has sat under MeitY since a notification of 7 February 2022. The official inquiry called the 1989 fire an accident. The upgrade was announced on 28 November 2025 and had not been completed by 29 November 2026.
💡 Short Answer
SCL Mohali is India’s government-run chip fab, set up in 1976 and hit by a fire on 7 February 1989 that wrecked its device line. It restarted wafer production in 1995 by one insider’s account, joined the Department of Space in 2005-06 and moved to MeitY in February 2022. Its 8-inch, 180 nm line made ISRO’s VIKRAM3201 and KALPANA3201 processors. A ₹4,500 crore upgrade was announced on 28 November 2025.
The Lead Picture: Key Dates, 1976 to 2026
Eleven dates in order.

SCL Mohali: Key Questions
What the Record Shows
- India started early: SCL was founded in 1976 and exported chips to West Germany and Hong Kong by 1986.
- The fire was an accident, officially: a 1991 Lok Sabha reply cited the inquiry’s finding; sabotage is only a theory.
- Recovery took years: packaging by 1991 and wafers by 1995, per an SCL insider.
- Ownership has moved twice: Space in 2005-06, MeitY on 7 February 2022.
- The node is mature by design: 180 nm suits analog, power and space parts.
- ISRO flies SCL silicon: VIKRAM3201 was validated on PSLV-C60, ISRO says.
- Students use it too: 56 student chips fabricated by January 2026.
- The upgrade is a plan: ₹4,500 crore announced, ₹900 crore reported in Budget 2026-27.
- It is not a leading-edge fab: HT reports the target is 28 to 180 nm, not 2 nm.
Timeline: SCL Mohali, 1976 to 2026
Newest first. Labels mark origins, the fire and recovery, space work, money and mission, and the wider ecosystem.
Jaishankar’s remark sends SCL’s history back into the news Ecosystem
The trigger: Speaking at the Hindustan Times Leadership Summit 2026, External Affairs Minister S Jaishankar said India had once had semiconductor plants and asked why an industry was not built. The HT explainer that followed retraced SCL’s story, from its 1976 founding to the 1989 fire.
Where the industry stands: HT reports that the Union Cabinet approved the Semicon India Programme in December 2021, that 12 projects have been cleared, and that five were in commercial production by October 2026, all of them chip assembly, test and packaging plants. The first large silicon fab, Tata Electronics’ plant at Dholera, is scheduled for 2028. In July 2026 the Cabinet approved Semicon 2.0, the second phase.
Chips to Start-up reaches 315 institutions Ecosystem
The numbers: The government says EDA tools are now available in 315 academic institutions, that India is on course for its 10-year target of training 85,000 semiconductor design engineers, and that over 1.85 crore hours of EDA tool use have been recorded. Student designs are fabricated and tested at SCL.
What is next: Under India Semiconductor Mission 2.0 the programme is to widen from 315 to 500 academic institutions.
PIB backgrounder tallies the Chips to Start-up programme Ecosystem
What it says: Around one lakh people have enrolled in chip-design training and about 67,000 are trained. Six shared wafer runs at SCL have carried 122 chip-design submissions from 46 institutions, and 56 student-designed chips have been fabricated, packaged and delivered. Participating institutions have filed over 75 patents and are developing more than 500 IP cores, ASICs and system-on-chip designs.
A count to watch: In November 2025 the same programme was described as five shared runs in the past year. January 2026 counts six runs over the programme’s life. The two figures measure different periods.
Union Budget sets aside ₹900 crore for the SCL upgrade Money & mission
The report: Swarajya reported on 3 February 2026 that the Union Budget 2026-27 secured ₹900 crore for SCL Mohali as part of the ₹4,500 crore modernisation drive. We could read only the headline and standfirst of that report, which says the money would fund training centres, commercial production units and R&D facilities.
What this does not show: An allocation is not expenditure. We found no public record of how much had been spent by 29 November 2026.
Rajya Sabha answer lists the scope of the upgrade Money & mission
What the answer says: Over its last 40 years SCL has developed more than 400 chip variants, including around 80 products, mainly for space and other strategic sectors. The modernisation would expand the 8-inch CMOS fab, add technology IP for RF-CMOS, CMOS image sensors and CMOS high-voltage LDMOS, and install modern software and automation. Technical and financial evaluations of the bids have been completed, and the results are on SCL’s website.
The unanswered premise: The question asked about a ₹10,000 crore plan said to have been announced in February 2024. The answer does not confirm that figure and gives ₹4,500 crore instead.
₹4,500 crore announced; 28 student chips handed over Money & mission
The announcement: On 28 November 2025 Union Minister Ashwini Vaishnaw announced that the Government of India would invest ₹4,500 crore to upgrade and expand SCL, saying it will be modernised and “will not be privatised”. The plan targets 100 times the present wafer production. The Centre has asked the Punjab government for 25 acres. Hindustan Times adds that the money is spread over three years and that SCL would be able to make chips from 28 to 180 nm.
The chips: At the same event 28 chips designed by students from 17 academic institutions were handed over, including 600 bare dies and 600 packaged chips (PIB, 29 November). The Minister also opened a Semiconductor Process Gallery and a training block, and announced a consortium of C-DAC, DRDO and others for strategic chips.
VIKRAM3201 and KALPANA3201 handed to ISRO Space & ISRO
The handover: ISRO says the first production lots of two 32-bit microprocessors were handed over on 5 March 2025 to ISRO Chairman Dr V. Narayanan by MeitY Secretary S. Krishnan. Both were designed by the Vikram Sarabhai Space Centre with SCL, which fabricated them. ISRO’s own page is dated 15 March, ten days after the handover.
The chips: VIKRAM3201 is described as the first fully Make-in-India 32-bit microprocessor qualified for launch-vehicle conditions, fabricated at SCL’s 180 nm CMOS fab. KALPANA3201 is a 32-bit SPARC V8 RISC processor based on IEEE 1754 and tested with flight software. Four other jointly developed devices went with them: two versions of a reconfigurable data acquisition system, a relay driver IC and a multi-channel low-dropout regulator.
Flight proof: ISRO says an initial lot of VIKRAM3201 was validated in space in the mission management computer of the PSLV Orbital Experimental Module (POEM-4) on the PSLV-C60 mission. An MoU on miniature pressure sensors for wind tunnels was signed the same day.
SCL moves from the Department of Space to MeitY The fire & recovery
The change: SCL’s own page says administrative control of the SCL Society was transferred from the Department of Space to the Ministry of Electronics and Information Technology by a notification dated 7 February 2022. Hindustan Times gives the month as February 2022.
Why the date stands out: It is the 33rd anniversary of the 1989 fire to the day. We found no source that links the two, and treat it as coincidence.
India’s semiconductor programme is approved Ecosystem
The programme: The Union Cabinet approved the Semicon India Programme in December 2021, according to HT. The outlay of ₹76,000 crore is widely reported for this approval; we could not read the Cabinet note itself, so treat the figure as reported. It covers fabs, assembly and packaging, display, compound semiconductors and design.
What it did for SCL: The programme did not itself fund SCL’s revival. The ₹4,500 crore for SCL was announced almost four years later and, per HT, is drawn from the first phase’s budget.
A Make-in-India VIKRAM1601 enters service Space & ISRO
What happened: ISRO says a Make-in-India version of the 16-bit VIKRAM1601 was inducted in 2016, after the 180 nm fab was established at SCL. The design itself had been flying since 2009.
Why it matters: Design in India and fabrication in India were now both possible for a flight processor.
SCL upgrades to 180 nm CMOS The fire & recovery
The upgrade: SCL upgraded to 180 nm technology in 2011-12, per HT. SCL’s website describes a baseline 180 nm CMOS process with 1.8 V core, 3.3 V I/O, up to six metal layers and analog modules, on an 8-inch line qualified to JEDEC JP001A.
The gap: HT notes the most advanced chips now use a 2 nm-class process, which TSMC said it began mass-producing in late 2025.
VIKRAM1601 begins flying on ISRO launch vehicles Space & ISRO
Role: ISRO says the indigenously designed 16-bit VIKRAM1601 has been flying in the avionics of its launch vehicles since 2009. VIKRAM3201 is described as an advanced version.
Tools: ISRO says the Ada compiler, assembler, linker, simulator and development environment for the VIKRAM family were built in-house, with a C compiler under development.
Semiconductor Complex Limited becomes the Semi-Conductor Laboratory The fire & recovery
The conversion: SCL says Semiconductor Complex Limited, a Government of India enterprise, was converted into the Semi-Conductor Laboratory under the Department of Space with effect from 1 September 2006.
The sequence: HT places the move under the Department of Space in March 2005. The 2005 step is HT’s; SCL’s own page gives only the 2006 conversion.
Wafer fabrication restarts The fire & recovery
The recovery: Manoj Wadhwa of SCL told HT the new packaging facility was ready by 1991 and wafer fabrication followed in 1995. HT reported in April 1993 that SCL was going ahead with a ₹315 crore revival scheme for chips of 1.5 micron and finer.
The bridge years: The government told the Lok Sabha in April 1992 that SCL had made modules and sub-systems, packaged imported chips at local assembly units, and sent chip fabrication to a contract maker in Austria, with packaging and testing in India.
Fire destroys the device fab The fire & recovery
What happened: A fire broke out at the complex on the night of 7 February 1989 and was put out on the morning of 8 February, minister of state KR Narayanan told Parliament. He said it caused extensive damage to the device manufacturing facility and the R&D area, while administrative buildings and the computer-aided design facilities were unaffected. There were no casualties.
The cost: He put the preliminary loss at about ₹60 crore. SCL had about 850 employees and about half were affected in terms of employment. SCL’s chairman and managing director, Virendra Mohan, resigned about a week later, taking moral responsibility, HT reported at the time.
The cause: An inquiry committee under Major General S.A. Mohile (retd) reported to SCL’s management by 1 March 1989. In August 1991 the government told the Lok Sabha it had found the fire could be considered “an unfortunate case of accident” and that responsibility could not be assigned to any individual or group. Wadhwa told HT in 2025 that the cause was inconclusive, probably a short circuit. India’s ambassador to Armenia has said the cause was never officially determined and that some suspect sabotage.
SCL exports three-micron chips Origins
The status: An archival HT report said SCL had begun exporting chips to West Germany and Hong Kong. They were three-micron chips, while the most advanced technology of the time already worked below one micron.
What it shows: SCL was commercially active, not a laboratory curiosity, though one generation behind the best.
Fabrication begins at Mohali Origins
Two dates: HT says SCL bought technology from American Microsystems Inc, a US company, and began fabrication in 1983. The Indian ambassador to Armenia, in 2025 remarks, says production began in 1984 and was of 5,000 nm chips, about one generation behind the global standard.
Our choice: We give both: fabrication 1983 (HT), production 1984 (ambassador). Different milestones, so both can be true.
Semiconductor Complex Limited is established Origins
The founding: HT says SCL was established in 1976 as a public sector company under the Department of Electronics to design, develop and manufacture large-scale and very-large-scale integration chips. SCL’s own page calls it a Government of India enterprise, as does the ambassador’s speech, which places it in Chandigarh.
The neighbours: HT adds that Bharat Electronics and Indian Telephone Industries in Bengaluru also had chip-making facilities, though they did not compare with SCL’s lines for production.
The 1989 Fire in Numbers
What Parliament was told.

The numbers come from a ministerial statement of 1 March 1989 and a 1991 written reply, both as reported by Hindustan Times. We could not open the Parliament records. The loss figure was preliminary and the final cost is not in the sources we read.
The Long Recovery
From fire to 180 nm.

The 1991 and 1995 dates are Manoj Wadhwa’s account to Hindustan Times, not government records. The 1992 Austria arrangement and the ₹315 crore scheme were reported at the time. A period of 22 years separates the fire from the 180 nm upgrade.
SCL’s Chips in ISRO Rockets
The March 2025 handover.

All details are from ISRO’s release of 15 March 2025. ISRO reports flight validation of only the first VIKRAM3201 lot; it does not say KALPANA3201 has flown.
Student Chips Made at SCL
Chips to Start-up, in numbers.

These are programme-wide figures from PIB, not SCL’s output alone. The wafer-run count differs by date: five in the year to November 2025 and six over the programme by January 2026.
Why 180 nm Still Matters
A mature node, used on purpose.

Newer is not always better: space electronics prize proven, long-lived, radiation-tolerant parts and secure supply. The gap with a 2 nm fab is real, though, and it is why the plan reaches for 28 nm.
The ₹4,500 Crore Plan
Announced, not delivered.

Open questions as of 29 November 2026: how much of the money has been spent, whether Punjab has allotted the 25 acres, which bidder won the equipment contracts, and when the new capacity will run. We found no public answer to any of these.
Source Gaps and Corrections
| Claim in the brief | What we found | Status |
|---|---|---|
| Fire cause: possible electrical cause, sabotage unproven | The inquiry called it an unfortunate accident; SCL says probably a short circuit | Sharpened |
| Transferred to MeitY in February 2022 | SCL cites a notification dated 7 February 2022 | Day added |
| Production in 1984 only | HT: fabrication from 1983; embassy: production 1984 | Both given |
| 28 chips handed over 28-29 November | Ceremony 28 November; PIB note 29 November | 28 Nov used |
| ISRO release dated 5 March 2025 | Handover 5 March; ISRO page dated 15 March | Both given |
| 2023 plan: 700 to 1,000-1,100 wafers a month | No source we could open states these figures | Dropped |
| December 2024 and July 2025 student-chip milestones | No source found for those dates | Dropped |
| 1995 5-micron and 2-micron processes | No source found | Dropped |
| 1978-83 construction milestones | HT gives fabrication from 1983 after buying AMI technology | Not used |
| ₹76,000 crore programme, December 2021 | HT confirms December 2021 approval; figure not read in primary text | Reported |
| Moved from Department of Information Technology in 2005 | HT gives March 2005 under Space; the previous owner is not named | Hedged |
Conclusion: A Chip Story India Forgot, Then Rediscovered
SCL’s history is more than a story of a fire. It shows a state-owned plant that was close to the world frontier in the mid-1980s, lost its device line in a night, and spent two decades getting back to a mature node. What survived is a small, strategic fab that flies chips in ISRO rockets and prints student designs.
Whether the ₹4,500 crore plan turns that into a larger national asset depends on equipment, land, process qualification and customers. The announcement is on record. The fab it promises is not yet.
Explore More Timelines
People Also Ask
Frequently Asked Questions
⚠️ Editorial Note
This page draws on PIB releases, ISRO’s release, SCL’s website, a Rajya Sabha answer and Hindustan Times reporting. Early dates (1991, 1995) come from an SCL official speaking to a newspaper. The cause of the 1989 fire is officially an accident; sabotage is not presented as fact. The ₹4,500 crore figure is an announced plan, not a completed project. Updated 29 November 2026.
Related Stories
Sources & further reading
Every dated entry above was checked against these references. Last reviewed 29 November 2026.
- Hindustan Times: India made chips at a Mohali plant in the 1980s; a fire destroyed its production lines (updated 16 November 2026)
- Semi-Conductor Laboratory: Introduction (official)
- Semi-Conductor Laboratory: CMOS fabrication facility, 180 nm process (official)
- ISRO: ISRO and SCL develop 32-bit microprocessors for space applications (15 March 2025)
- PIB: Government to invest Rs 4,500 crore for modernisation of SCL Mohali (28 November 2025)
- PIB: Democratizing chip design with EDA tools and multi-project wafers (29 November 2025)
- PIB Backgrounder: Chips to Start-up programme (18 January 2026)
- PIB: Chips to Startups progress (7 March 2026)
- Rajya Sabha Unstarred Question 2290: Modernisation plan of SCL Mohali (19 December 2025)
- Embassy of India, Yerevan: Opening remarks at Armenia Engineering Week 2025